Distribution Systems Testing, Application and Research


Home > Research Activities: Project Listing - Program 1
Project Listing
Research Summary
Project Listing
Software Products
Obtaining Software

 Program 1

   1-1    URD Overvoltage Protection

Using full-scale impulse tests on buried URD cable, classical underground distribution system overvoltage protection theory was validated. Included were comparisons of SiC and ZnO arrester performance, comparisons of arrester placement, and mid-span voltage magnification due to taps.

Deliverable: Impulse Testing of Underground Direct-Buried Cable," Phase I Final Report, 11/15/88.

    1-2    URD Overvoltages Considering Transformers and Grounding

Using full-scale impulse tests, impulse overvoltages on URD systems were investigated considering: transformer characteristics and secondary currents due to a poorly grounded primary neutral. Also, a computer-based tutorial on underground distribution overvoltage protection was created.

Deliverables:

"Application Guidelines: Overvoltage Protection of Underground Cable Systems," Phases I and II, 2/17/89;
"Distribution Testing Tutorial and Spreadsheet Version 2.0," May 10, 1990;
"Secondary Surge and Jacketed Cable Investigation" Final Report, 5/14/90.

    1-3    Fast and Slow-Front Surges

Using full-scale impulse tests, cable system overvoltages due to fast and slow-front surges were investigated. Guidelines for mitigation of lead-length voltage effects were developed.

Deliverable: "Fast and Slow Front Testing of Jacketed Cable" Final Report, 7/13/90.

 

Home | About DSTAR | DSTAR Objectives | DSTAR Organization | History of DSTAR | DSTAR Members | DSTAR Leadership
How to Join DSTAR | Obtaining Products | Research Activities | Research Summary | Project Listing | Software Products | Obtaining Software | Members Area

Copyright © 2005 GE Energy. All rights reserved. Contact: Devin Van Zandt