Engineering Guidelines


  • Ferroresonance Guidelines (P2-4, 4-1a, 4-1b, 4-1c)
  • Distribution Transformer Harmonic Derating Guidelines (P4-3)
  • Minimizing the Impact of Secondary-Side Surges on Distribution Transformers (P4-5)
  • Wye-Delta Overhead Bank Overvoltages (P5-2)
  • Transformer Loading And Economic Evaluation (P7-1, 7-3, 10-4, 11-9)
  • Transformer Seasonal Loading Analysis Guidelines (P8-10)
  • Transient Currents in Capacitor Fuses (P8-3)
  • CFO Calculation and Arrester Application Guidelines (CFOCAST)(P10-10, 11-0)
  • Wildlife Control and Protection Manual (P10-3)
  • Completely Self-Protected Transformer Evaluation (P10-7)
  • Improving Utility Energy Efficiency (P12-4)
  • Current-Limiting Fuse Application Guidelines (P12-7)
  • Capacitor Control Guidelines (P12-8)
  • Conservation Voltage Reduction (CVR) Evaluation (P13-7)
  • Surge Protection of Electronically-Controlled Devices Installed in Distribution Systems (P14-4)
  • Motor Problem Resolution and Avoidance Guide (P14-8)
  • Impact and Practical Limits of PV Penetration on Distribution Feeders (Hosting Capacity) (P15-6)
  • LED Street Lighting Analysis and Tool (P15-7)
  • Distribution Data eHandbook (P9-1, 10-2, 10-9, 10-14, 11-3, 12-3, 16-5)