Engineering Guidelines
- Ferroresonance Guidelines (P2-4, 4-1a, 4-1b, 4-1c)
- Distribution Transformer Harmonic Derating Guidelines (P4-3)
- Minimizing the Impact of Secondary-Side Surges on Distribution Transformers (P4-5)
- Wye-Delta Overhead Bank Overvoltages (P5-2)
- Transformer Loading And Economic Evaluation (P7-1, 7-3, 10-4, 11-9)
- Transformer Seasonal Loading Analysis Guidelines (P8-10)
- Transient Currents in Capacitor Fuses (P8-3)
- CFO Calculation and Arrester Application Guidelines (CFOCAST)(P10-10, 11-0)
- Wildlife Control and Protection Manual (P10-3)
- Completely Self-Protected Transformer Evaluation (P10-7)
- Improving Utility Energy Efficiency (P12-4)
- Current-Limiting Fuse Application Guidelines (P12-7)
- Capacitor Control Guidelines (P12-8)
- Conservation Voltage Reduction (CVR) Evaluation (P13-7)
- Surge Protection of Electronically-Controlled Devices Installed in Distribution Systems (P14-4)
- Motor Problem Resolution and Avoidance Guide (P14-8)
- Impact and Practical Limits of PV Penetration on Distribution Feeders (Hosting Capacity) (P15-6)
- LED Street Lighting Analysis and Tool (P15-7)
- Distribution Data eHandbook (P9-1, 10-2, 10-9, 10-14, 11-3, 12-3, 16-5)
Tagged: No Tags