Equipment Testing/Evaluation
- Underground System Overvoltage Protection (P1-1, 1-2, 1-3)
- Impulse-Duty Aging of Underground Cables (P2-1)
- Semi-Conductive Jacketed Cable Investigation (P2-2)
- Switching Surges in Underground Distribution (P2-3)
- Ferroresonance Guidelines (P2-4, 4-1a, 4-1b, 4-1c)
- Padmount Transformer Fault Current Withstand (P3-4)
- Distribution Transformer Harmonic Derating Guidelines (P4-3)
- Minimizing the Impact of Secondary-Side Surges on Distribution Transformers (P4-5)
- Wye-Delta Overhead Bank Overvoltages (P5-2)
- Investigations of Elbow and Insulated Cap Flashover (P5-1, 6-1)
- Underground Cable Ampacity Testing (P7-5, 7-7)
- Transient Currents in Capacitor Fuses (P8-3)
- Elbow and Overhead Arrester Design Evaluation (P10-17)
- Solid-Blade Switch Testing (P11-12)
- Surge Protection of Electronically-Controlled Devices Installed in Distribution Systems (P14-4)
- LED Street Lighting Analysis and Tool (P15-7)
- Impulse Testing of Electronic Controllers (P15-8)
- Evaluation of Power Control Devices (P16-6)
Tagged: No Tags