Items tagged Engineering Guidelines
Projects
- 1-1 Impulse Testing of Underground, Direct-Buried Cable
- 1-2 Secondary Surge and Jacketed Cable Investigation
- 1-3 Fast and Slow-Front Surges
- 2-1 Field-Aged Cable Testing
- 2-2 Semi-Conductive Jacketed Cable Investigation
- 2-3 Switching Surges in Underground Distribution Systems
- 2-4 Ferroresonance Guidelines for Modern Transformer Applications
- 3-1 Supplemental Cable Tests and Improved System Grounding
- 3-2 Distribution Line Protection and Reliability
- 3-3 Mitigation of Distribution Feeder Harmonics by Passive Techniques
- 3-4 Fault Energy Guidelines for Transformer Enclosures
- 4-1a Ferroresonance Guidelines for Additional Padmount Transformer Types
- 4-1b Survivability of MOV Arresters Subjected to Ferroresonance Overvoltages
- 4-1c Ferroresonance Survivability of Under-Oil Arresters
- 4-3 Distribution Transformer Harmonic Derating Guidelines
- 4-5 Minimizing the Impact of Secondary Surges on Distribution Transformers
- 5-1 Elbow Switching Capabilities for Unloaded Cable
- 5-2 Floating Wye-Delta Overhead Bank Overvoltages
- 5-3 Gapped MOV Arrester Characteristics
- 5-4 Software Development for the Analysis of Cold Load Pickup
- 5-5 Transformer Owning Cost Software
- 5-6 Service Entrance Protection Coordination
- 6-1 Elbow Switching Performance Tests
- 6-2 Distribution Transformer Load Demand Algorithm
- 6-4a Distribution Transformer Owning Cost Software Enhancements, Phase A
- 6-4b Distribution Transformer Owning Cost Software Enhancements, Phase B
- 6-5 Unbalanced Transformer Bank Software
- 6-6 Cable Electrical Parameters Software
- 6-7 Cable Ampacity Derating
- 7-1 Distribution Engineering Toolbox
- 7-2 Secondary Electrical Design Software
- 7-3 Transformer Scrap/Repair Decision Software
- 7-4 Cable Electrical Parameters Software Enhancement
- 7-5 Riser Cable Ampacity
- 7-6 Elbow Flashover Incident Reporting
- 7-7 Cable Temperature Effects of Limited-Distance Heat Sources
- 7-8 DSTAR Seminar
- 8-2 Cable Electrical Parameters Software Enhancement
- 8-3 Capacitor Transient Currents
- 8-4 Primary Flicker And Impedance
- 8-6 DSTAR T&D Show
- 8-7 System Owning Cost Comparison Software
- 8-8 Impact of Distributed Generation
- 8-10 Seasonal Loading Equivalents
- 9-1 DSTAR Distribution e-Handbook
- 9-2 Cable Pulling Assistant (CPA) Software Enhancements
- 9-3 Guy Tension Analyzer (GTA) Software Enhancements 1
- 9-4 Guy Tension Analyzer (GTA) Software Enhancements 2
- 9-5 Economic Overhead Conductor Sofware (EOCS)
- 9-6 Secondary Electrical Design Software (SEDS) Enhancement
- 10-1 DSTAR Software Custom Parameter Maintenance Simplification
- 10-2 DSTAR Expansion of Distribution Data e-Handbook
- 10-3 Wildlife Control and Protection Guide
- 10-4 DSTAR TOCS Data Import Enhancement
- 10-5 DSTAR CPA Enhancement
- 10-6 DSTAR CEPS Enhancement
- 10-7 Completely Self-Protected (CSP) Transformer Evaluation
- 10-10 CFO Calculator and Arrester Application Guidelines
- 10-11 Technology Whitepapers - BPL, Electronic Switching, Transformer Impedance
- 10-14 Electronic Data Handbook (ehandbook) Expansion
- 10-15 SEDS Enhancements
- 10-16 CFO Calculator and Arrrester Aplication Guide
- 10-17 Elbow and Overhead Arrester Design Evaluation
- 11-0 Office 2007 Updates
- 11-1 Anchor Corrosion Detection
- 11-2 Voltage Flicker Issues Related to New Large Residential Loads
- 11-3 Electronic Data Handbook (eHandbook) Expansion
- 11-4 SEDS Enhancements
- 11-5 Implications of Communications Equipment Mounted in the Electric Space on Distribution Poles
- 11-7 Best Practices for Storm Response on U.S. Distribution Systems
- 11-8 Harmonic Load Calculator
- 11-9 Transformer DOE Standards Evaluation
- 11-12 Solid Blade Switch Testing
- 11-13 Feeder Automation White Paper
- 12-2 SEDS Enhancements
- 12-3 Electronic Data Handbook (eHandbook) Expansion
- 12-4 Improving Energy Efficiency of Utility Systems
- 12-5 Impact of Non-Wood Poles on Reliability
- 12-6 The Changing Nature of Loads and Impact on Utilities
- 12-7 Guidelines for Current Limiting Fuses Application
- 12-8 Capacitor Control Guidelines: Choosing Type and Settings
- 13-0 Planning and Organization
- 13-2 Commercial Load Estimation Tool
- 13-3 Survey of Practices for Equipment Inspection, Maintenance and Thermal Imaging
- 13-4 SEDS Enhancements
- 13-5 Harmonic Load Issues, Impact, and Mitigation
- 13-6 Centralized vs. Distributed FA and Impacts On Distribution Performance
- 13-7 Conservation Voltage Reduction (CVR) – Testing, Methods, and Results
- 13-8 SEDS Lighting Tool
- 13-9 Impact of Photovoltaic Generation on Distribution Systems
- 13-10 Smart Grid Impact on Distribution Reliability
- 13-11 Window 7 Software Updates
- 14-4 Surge Protection of Electronically-Controlled Devices Installed in Distribution Systems
- 14-5 Cable Pulling Assistant Updates
- 14-6 Best Practices for Integration of Utility Applications
- 14-7 Survey of Best Practices for Copper Theft Deterrence
- 14-8 Motor problems Resolution and Avoidance – Update CRN Publication
- 14-9 Guide to Best Practices for Improving Distribution Reliability
- 14-10 CEPS Enhancements
- 15-4 Development of Engineering Mobile Apps
- 15-6 Impact and Practical Limits of PV Penetration on Distribution Feeders
- 15-7 LED Street Lighting
- 15-8 Impulse Testing of Electronic Controllers
- 15-9 Development of Additional Engineering Mobile Apps
- 16-5 Electronic Data Handbook (eHandbook)